An ACI system learns its criteria from one golden board and keeps updating from review results. Acceptance therefore covers an imaging chain plus a judge that changes: gauge R&R for the imaging chain, attribute agreement analysis for the judge, a statistical upper bound for the escape rate, and change control for model updates.

±6μmHeight accuracy (calibration tool)
3/n95% upper bound on escapes at zero misses
<12msEdge inference latency

ACI in this article stands for Auto Cognitive Inspection — the next-generation term for AI AOI: keep the A and the I, and replace the O (optical) with C (cognitive), because the decision basis is cognition rather than the imaging method. The full argument is set out in From AI AOI to ACI.

Acceptance of a rule-based inspection machine follows a familiar routine: review the program, run a batch of boards, count escapes and false calls. ACI learns its criteria from one golden board and keeps updating from review results after go-live. This article lays out a method that can go straight into an acceptance protocol: qualify the system as two measurement systems, put a statistical upper bound on the escape rate, and bring model updates under change control.

Technical Principle: Two Measurement Systems in One ACI Machine

In measurement systems analysis (MSA) terms, a 3D ACI machine contains two kinds of gauge, each with its own qualification method.

The imaging chain is a variable gauge. Structured light returns continuous quantities such as height, coplanarity and volume, so a gauge repeatability and reproducibility (GR&R) study applies: take 10 physical parts spanning the tolerance band, re-fixture and measure them repeatedly, and compute measurement variation as a share of tolerance. A common reading is that under 10% is acceptable and 10% to 30% is conditionally acceptable depending on use. DaoAI's 3D ACI machines P5 / P5D are rated at ±6μm height accuracy (with calibration tool), 10μm optical resolution and 25mm maximum range (source: 3D ACI equipment page). The rating says what the machine can do; GR&R says what it does on your parts, your fixtures and your floor, and that is what the protocol needs.

The judge is an attribute gauge. The model outputs pass or fail plus defect class and location, so attribute agreement analysis applies: prepare samples with known truth, run several blind rounds, and report three quantities: escape rate (true defects passed), false-call rate (good parts stopped) and repeat consistency (whether the same part gets the same verdict across runs, expressed as Kappa, with 0.75 and above usually read as good agreement).

Qualifying the two separately keeps attribution clean. A biased height reading is an optics and calibration issue; an accurate reading with a wrong verdict is a model and criteria issue. The corrective paths are separate.

Building the Sample Set: Three Groups, Three Risks

ACI models from good parts, and modeling needs one golden board. The acceptance sample set asks for more, in three groups.

  • True-defect parts: every defect mode in the control plan, each at an obvious and a borderline level. Borderline parts set the real escape rate.
  • Normal-variation parts: different incoming lots, same-spec components from different suppliers, allowed offsets and reflections. This group sets the false-call rate and is where semantic false-call filtering does its work.
  • Good parts outside the modeling set: from a different lot than the golden board, to confirm the model learned the normal form of this component class.

Sample truth is established by manual review plus destructive analysis where needed, and the set is sealed before acceptance starts.

Computing the Upper Bound on Escapes

A batch with zero escapes becomes a conclusion once it is converted into a confidence bound. For the zero-escape case there is a shop-floor approximation: with 0 escapes in n true-defect opportunities, the 95% upper confidence bound on the escape rate is about 3/n.

  • 300 true-defect opportunities, zero escapes: 95% upper bound about 1.0%.
  • 1000 opportunities, zero escapes: about 0.3%.
  • 3000 opportunities, zero escapes: about 0.1%.

Use these figures to back out sample size: a protocol limit of 0.1% on escapes needs about 3000 true-defect opportunities with zero escapes. When defect parts are scarce, the same part can be run under different fixturing and on different days to accumulate opportunities, with the report stating that these are repeated measurements. False calls are counted in ppm per inspection opportunity with the same statistics.

The 98% detection accuracy on one-click modeling shown on the equipment page (source: ACI equipment overview, post wire-bond inspection) is the starting reading when modeling completes. Acceptance answers a different question: the measured value and its confidence interval on the sealed sample set after on-site review feedback.

Application Scenarios: What to Emphasize at Three Stations

Post-reflow 3D inspection in SMT. The emphasis is on the variable side: GR&R for coplanarity, paste and joint height. Cycle time is checked here too. P5 / P5D are rated above 10cm²/s inspection speed (source: 3D ACI equipment page); a 250mm × 200mm board is 500cm², so imaging takes at most about 50 seconds, which informs the choice of a dual-lane model.

BGA and bottom-terminated components. Start by drawing the physical boundary of the imaging. Structured light measures surface geometry: component coplanarity, height and shape of visible joints. Voids inside a solder ball are internal defects of an opaque body, imaged by X-ray or CT, with ACI reading those images. The protocol lists items per imaging method, each with its own samples.

High-mix, low-volume changeover stations. The emphasis is first-article confirmation after changeover. The equipment page gives modeling time as 30 seconds to 5 minutes from one golden board (source: 2D ACI equipment page). During acceptance, time the full span from board load to first verdict with a stopwatch, then run a subset of the sealed sample set right after changeover to confirm escape and false-call levels for the new program.

Case Study: What an Acceptance Plan Looks Like

A mid-sized PCBA plant brought a DaoAI 3D ACI machine into its post-reflow station, and the quality department wrote the acceptance plan along these lines (anonymized industry scenario; figures are typical achievable ranges for plan parameters and are subject to on-site measurement).

  • Variable: 10 physical parts spanning the coplanarity tolerance band, 3 fixturings with 3 measurements each, 90 readings for GR&R.
  • Attribute: 60 true-defect parts covering 12 defect modes, each with borderline parts; 5 consecutive working days at 10 blind rounds per day, 3000 true-defect opportunities in total.
  • False calls: 500 good boards from three incoming lots, counted in ppm per component-level opportunity.
  • Consistency: the same samples re-run on alternate days, with Kappa for repeat verdicts.
  • Release condition: GR&R, escape upper bound, false-call ppm and Kappa all meet target.

Each item in this plan maps to a number that can be recomputed and to a clear owner for corrective action.

The figures above are a typically achievable range in anonymized industry scenarios — a different line or a different batch of parts will move the result either way; on-site measurement governs.

Models Update, So Acceptance Needs a Second Phase

After go-live, operator review results feed back into the model; that is how ACI is designed. For the quality system each model update is a controlled change, and the protocol should fix four things.

  • Version record: each model version carries an ID, an effective time and the range of review data behind it.
  • Regression set: the sealed acceptance samples are kept long term and re-run after every update, with all four metrics staying at or above release level.
  • Ownership of criteria: thresholds and release criteria stay with the plant's quality department, and changes to release standards go through the plant's own change process.
  • Rollback path: restore the previous version when regression misses target.

On data, golden-board images, point clouds and inspection results are processed and stored on the local all-in-one unit and stay on site; edge inference latency is rated under 12ms and line verdicts are computed locally (source: 3D ACI equipment page).

Product Solution: The Equipment Forms This Method Applies To

DaoAI's ACI comes in three forms on one model foundation, DaoAI World: the ACI OS operating system connects to cameras and machines already in the plant; 2D ACI equipment covers surfaces and components; 3D ACI equipment adds height and coplanarity measurement. As of June 30, 2026, cumulative deployments of ACI cognitive inspection equipment reached 1000 units, concentrated in semiconductor and PCBA.

The method applies to all three forms: GR&R where there is continuous output, attribute agreement analysis where there is a verdict, regression where there are model updates. With the protocol written at this level, supplier and plant quality department read 'accepted' off the same set of numbers.

See specifications on the 3D ACI equipment page.

FAQ

How many true-defect samples does ACI acceptance need?

It depends on the escape limit in the protocol. With zero escapes the 95% upper bound is about 3/n: a 1% limit needs about 300 true-defect opportunities, a 0.1% limit about 3000. Scarce parts can be re-run to accumulate opportunities, with that stated in the report.

How much time and cost does a full acceptance round take?

Cost is mainly sample preparation and blind-test labor. With the plan parameters in this article, blind testing runs 5 consecutive working days at 10 rounds per day; actual effort varies with the number of defect modes and sample sources and is subject to on-site measurement.

Does a model update require re-acceptance?

After each update, re-run the four metrics (GR&R, escape upper bound, false-call ppm, Kappa) on the sealed regression set. At or above release level, production continues on the new version; otherwise restore the previous version.

Related Cases

Full solution for this scenario: the full inspection solution for 3D ACI Equipment

This article is an original publication by WeLinkirt (DaoAI). Under customer confidentiality, cases are anonymized industry scenarios and figures are illustrative; see product pages for official benchmarks.

Book a Demo / Get a Quote View 3D ACI Equipment solutions